Ready Mix Concrete used from ABC BPL

2013-04-08 13.37.53

Early foundation stage, all modern machinery and tools used from day 1

150520131288

Strong Foundation

2013-05-04 12.43.20

Skilled and dedicated professionals with close supervision

WP_20140722_036

500W XTREME (BSRM/AKS) TMT bar all through

AKH 3D Floor Plan

Brilliant interior plan and best utilization of space (keeping light and air flow in mind and also family privacy)

20140924_135801 20140924_135952

2013-05-04 13.02.26

BSRM 500 w XTREME TMT Bar

IMG_3362

Ready mix concrete : average 500 psi strength ensured all through (collected BUET test report time to time)

WP_20140628_032

Extra care at every stage

040520131166

Precision from irreplaceable stage

A minute away from this project is the New DOHS Lake – an ideal, secure, serene landscape for walking and lounging.     